Le Tour de Lngkawai 2010

Organized Ministry of Youth and Sports, together with the Malaysian National Cycling Federation (MNCF) while the Prime Minister as the Patron of the event. Le Tour de Langkawi 2010 is scheduled to take place from 1st to 7th of March 2010, involving seven stages and covering a total distance of 1,001.8 km.

The race will go through seven states of Kelantan, Terengganu, Pahang, Johor, Malaka, Negeri Sembilan, Selangor and two Federal Territories; which are Putrajaya and Kuala Lumpur. The route selection this time based on various factors, including technical aspects, logistics, tourism and sponsors, involves 13 venues including a new venue in the history of the LTDL organization at Parit Sulong in the state of Johor.

The seven stages are:
1 Kota Bharu – Kuala Berang (174.5km)
2 Kuala Terengganu – Chukai (182.9km)
3 Pekan, Pahang – Mersing, Johor (144km)
4 Mersing, Johor – Parit Sulong, Johor (163.5km)
5 Muar, Johor – Port Dickson, Negeri Sembilan (140.2km)
6 Putrajaya, WP – Genting Highlands (103.9km)
7 Kuala Kubu Baru – Dataran Merdeka (loop x6) (92.8km)

6 comments:

azies said...

Bro, LTD Langkawi tahun depan lalu Johor, tapi tak sampai JB. Team pontian bila pulak nak redah gunung pulai.....Orang Kulai senyap aje... Dah nak tukar frame baru ke...

sah_kul said...

Orang kulai sibuk memanjang la bro...bila tak sibuk kena demam la pulak. Kawan x de plan nk amik frame baru stakat ni...

azies said...

Bro,mcm ne dengan result UPSR sek? Dengar cerita BI ada sikit susah. This weekend apa program, sek dah cuti boleh trainning pagi petang, mesti kuat punya....

sah_kul said...

Result ok ok jer...percent subjek aku (SC) naik. Dgr crita da kelas tambahan cuti sk niii. Suwey betul...bosan bosan

azies said...

Bro,itulah sumbangan seorang guru utk nusa dan bangsa......Gaji bertambah berkat.....

sah_kul said...

bai...lu ada tisu lebih??

Related Posts with Thumbnails